ServicesCasesTechnologyBlogAboutContact Discuss a project

Redesign that lifts conversion — without losing SEO

We rebuild outdated websites: modern UX, 90+ PageSpeed, editable Bricks blocks — while rankings and traffic are preserved with a full 301 map, meta data transfer and Search Console monitoring.

+64%
AVG. CONVERSION LIFT
0
TRAFFIC LOST ON MIGRATION
3–5
WEEKS TO RELAUNCH
Express request
UX audit findings — within 48 hours
NO SPAM · NDA ON REQUEST
WHAT’S INCLUDED

Relaunch as a system, not a facelift

First we measure what loses money — then we redesign exactly that. Data first, pixels second.
01
UX & analytics audit
Heatmaps, funnels, session recordings — we find where visitors drop and why.
02
SEO inventory
Rankings, traffic pages, backlinks — everything that must survive the relaunch, mapped.
03
New design
Modern UI on your brand: conversion paths, trust blocks, mobile-first.
04
Bricks rebuild
Clean fast build, editable blocks, forms and integrations preserved or improved.
05
301 map & meta transfer
Every old URL redirected, titles and Schema.org carried over — Google never loses the trail.
06
Post-launch monitoring
4 weeks of Search Console and analytics watch: any ranking dip caught and fixed.
PROCESS

The first 90 days

WEEK 1
Audits
UX + SEO audit, list of conversion killers, relaunch plan.
WEEKS 2–3
Design & build
New design on real content, Bricks build in parallel.
WEEK 4
Migration
301 map, meta transfer, staging tests, speed 90+.
WEEK 5+
Launch & watch
Relaunch + 4 weeks of ranking and conversion monitoring.
PACKAGES & PRICING

The quote is fixed before we start

Fixed monthly price. Contract, reporting, cancel anytime.
FACELIFT
€1,200FROM
Design refresh on current CMS
Key pages redesigned
Speed 90+ and mobile UX
Forms and analytics check
Timeline: 2–3 weeks
Choose FACELIFT
MOST POPULAR
RELAUNCH
€2,200FROM
Full rebuild + migration to Bricks
UX + SEO audit included
New design, full rebuild
301 map, zero traffic loss
4 weeks post-launch watch
Timeline: 3–5 weeks
Choose RELAUNCH
REPLATFORM
€3,500FROM
From Wix/Tilda/custom to WordPress
Content and data migration
Everything in Relaunch
Integrations rebuilt
Timeline: 4–6 weeks
Choose REPLATFORM
CALCULATOR

Estimate the cost in 10 seconds

Three questions — an honest budget estimate before any call.
SCOPE
SITE SIZE
SEO STAKES
BUDGET ESTIMATE
€1200
PER PROJECT · RESULTS IN 2–3 WEEKS
EXACT QUOTE — AFTER A FREE AUDIT
RESULTS

Related cases

SERVICE IN DETAIL

Website redesign without losing traffic: how a safe relaunch works

Why redesigns kill traffic — and how we prevent it

Most traffic drops after a redesign come from three mistakes: changed URLs without redirects, lost meta data, and deleted pages that held rankings. Our relaunch protocol makes them impossible.

full URL inventory and a 1:1 301 redirect map;
titles, descriptions and Schema.org carried to the new build;
ranking pages rebuilt, never silently deleted;
4 weeks of Search Console monitoring after launch.

Result across our relaunches: zero lost traffic, and usually growth — the new build is faster and better structured.

When a redesign pays off

A redesign is a business decision, not a beauty contest. It pays off when the current site measurably loses money: high mobile bounce, conversion under market benchmarks, PageSpeed in the red, or a CMS the team can’t edit.

conversion below 1% on commercial traffic;
PageSpeed under 50 — you pay for ads the site wastes;
every text change requires a developer;
the design undermines trust in a premium product.

We start with a free audit: if a facelift of 3 pages solves it, we’ll say so — instead of selling a full relaunch you don’t need.

RELATED SERVICES

Often ordered together

FAQ

Frequent questions

Didn’t find your answer — ask on Telegram, we reply within 2 hours.
Will we lose Google rankings?
No — that’s the point of the protocol: full URL inventory, 1:1 301 map, meta and Schema.org transfer, and 4 weeks of post-launch monitoring. Across our relaunches, organic traffic is preserved or grows.
How much does a redesign cost?
Design refresh on your current CMS — from €1,200. Full relaunch with migration to Bricks — from €2,200. Replatforming from Wix/Tilda/custom — from €3,500. The audit tells us which one you actually need.
Can you migrate from Wix / Tilda / Squarespace?
Yes — content, blog posts, forms and SEO signals move to WordPress + Bricks. You get an editable, faster site without platform fees, with all URLs redirected.
How long does it take?
Facelift — 2–3 weeks, full relaunch — 3–5 weeks, replatform — 4–6 weeks. The site stays online the whole time; we switch over in one night.
What if conversion doesn’t improve?
We baseline conversion before the relaunch and compare after. Design decisions come from your analytics (heatmaps, funnels), not taste — and the first month of measurement and fixes after launch is included.
IN SHORT · FOR SNIPPETS AND AI ANSWERS

Quick answers

Structured facts with FAQPage / Schema.org markup — cited by Google, ChatGPT and Perplexity.
WILL SEO SURVIVE?
Yes: 1:1 301 map, meta transfer and 4-week monitoring. Zero traffic loss across our relaunches.
HOW MUCH IS A REDESIGN?
Refresh from €1,200, full relaunch from €2,200, replatform from €3,500.
HOW LONG DOES IT TAKE?
2–6 weeks depending on scope. The old site stays online until the switch.
FROM WIX OR TILDA?
Yes — full migration to WordPress + Bricks with content, forms and redirects.

Find out what your site loses

Free audit: UX conversion killers, speed, SEO risks — and an honest verdict: facelift or relaunch.